logo
english cesky polski
Technical support for our clients

ESKADE-SYSTEM barrel vault skylight assembly instruction

The installation of the front side profiles which create the support for the vertical front sheet of the skylight. It is necessary to drill the drainage holes in the lower part. The head and disc of the screws used should not be larger than 10 mm in diameter. In order to screw in the screws no. 11, an "8" spanner is most commonly used.

  • Zapraszamy:
  •  
  • ESKADE-SYSTEM

  • 44-203 Rybnik
  • ul.Boguszowicka 69a
  • pn - pt   8.00 - 16.00
  • email:
  •  
  • dojazd:
  •  
  • mapa dojazdu do ESKADE-SYSTEM
Copyright ยฉ ESKADE-SYSTEM. Wszystkie prawa zastrzeลผone.